Mont Buxton
|
MBX-11-17
|
Construction of Road 01 Survey
|
Sinon Survey Pty Ltd
|
10200
|
06/11/2017
|
30/11/2017
|
|
Mont Buxton
|
MBX-10-18
|
CONSTRUCTION OF FOOTPATH - BUTTON LANE
|
|
|
07/06/2018
|
07/06/2018
|
|
Mont Buxton
|
MBX-09-17
|
CONSTRUCTION OF BIN SITE & RETAINING WALL - DAN LENN - ADDITIONAL WORKS
|
TCH Contractor
|
50091.20
|
07/06/2018
|
07/06/2018
|
|
Mont Buxton
|
MBX-05-18
|
CONSTRUCTION OF RETAINING WALL - MC ROAD
|
Nelson Hoareau
|
35374.87
|
07/06/2018
|
07/06/2018
|
|
Mont Buxton
|
MBX-04-18
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD AND BOUNDARY WALL PHASE 02 - HANGAR STREET
|
ANB Builders
|
120394
|
07/06/2018
|
07/06/2018
|
|
Mont Buxton
|
MBX-03-18
|
CONSTRUCTION OF BOUNDARY WALL & ENLARGEMENT OF BRIDGE - MOOSA LANE
|
DIRECT BID
|
DIRECT BID
|
07/06/2018
|
07/06/2018
|
|
Mont Buxton
|
MBX-02-18
|
UPGRADING OF EXISTING FOOTPATH - MONDON ESTATE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-12-18
|
SECONDARY MOTORABLE ACCESS ROAD CHARLES - BASIN BLEU (survey)
|
Sinon Survey Pty Ltd
|
10800
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-11-18
|
RELOCATION OF SOAKAWAY AND STEPS - LA LOUISE
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-10-18
|
CONSTRUCTION OF MOTORABLE ROAD ACCESS - DAN RIMA AT UPPER LES MAMELLES
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-09-18
|
CONSTRUCTION OF DRAINAGE PHASE 2 - RAGUIN ROAD
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-08-18
|
CUTTING AND BREAKING OF ROCKS AND CONSTRUCTION OF RETAINING WALL - LA LOUISE
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-06-18
|
CONSTRUCTION OF STEPS AND INSTALLATION OF RAILING - BASIN BLEU
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-05-18
|
CONSTRUCTION OF BOUNDARY WALL - SEMEN KAN TOBURK - LOWER LES MAMELLES
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-04-18
|
CONSTTRUCTION OF MOTORABLE ACCESS -SEMEN KOSMONLEDO PHASE 04
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-04-17
|
CONSTRUCTION OF DRAINAGE - RAGUIN ROAD PHASE 01
|
Azemia Construction
|
19000
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-03-18
|
INSTALLATION OF GRILL OVER EXISTING DRAIN @ LE ROCHER TURNING AREA
|
J & R Builders
|
15800
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-02-18
|
RESURFACING OF COURT
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
Les Mamelles
|
LEM-01-18
|
CONSTRUCTION OF BOUNDARY WALL & STONE EDGE WALL - UPPER LES MAMELESS - HOUSING ESTATE
|
J & R Builders
|
33883
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG--07-18
|
CONCRETE SURFACING OF FOOTPATH NEAR ANSE REUNION HOUSING ESTATE - SURVEY
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG-06-18
|
TRACING OF ACCESS ROAD - LA PASSE - SURVEY
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG-04-18
|
CONSTRUCTION OF PUBLIC TOILETS AND SHOWER FACILITY AT DA'S OFFICE - LA PASSE
|
OPEN BID
|
OPEN BID
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG-04-17
|
Construction of Pathway - Rocky Ah-kong - La Passe La Digue
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG-02-18
|
REFURBISHMENT OF PLAYGROUND AND TUCK SHOP -
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
La Digue
|
LDG-01-18
|
CONSTRUCTION OF FEEDER ROAD - ROCHE BOIS - PHASE 02
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Glasic
|
GLS-05-17
|
CONSTRUCTION OF CHANGING ROOM
|
AMB Building Contractor
|
387711.05
|
07/06/2018
|
07/06/2018
|
|
Glasic
|
GLS-01-18
|
CONSTRUCTION OF BIN SITES (X4) NORTH EAST POINT
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-07-17
|
RESURFACING OF MULTIPURPOSE COURT
|
SLTA
|
297000
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-05-18
|
CONSTRUCTION OF ACCESS ROAD @ ST JOSEPH (P & I GARAGE AREA)
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-05-17
|
INSTALLATION OF RAILING ALONGSIDE EXISTING STEPS @ BEL AIR
|
JNC Contractor
|
65250
|
01/10/2017
|
03/11/2017
|
|
Grand Anse Praslin
|
GAP-04-18
|
SURFACING OF ROAD @ LE MODESTIE ACCESS ROAD
|
JNC Contractor
|
270,000.00
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-04-17
|
INSTALLATION OF LIGHTS @ MULTIPURPOSE COURT
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-02-18
|
SURFACING OF ROAD @ MARIE ACCESS
|
W Building Contractor
|
74100
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-01-18
|
SURFACING OF ACCESS ROAD - LE VOYAGER - ANSE KERLAN
|
JNC Contractor
|
360000
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Praslin
|
GAP-01-17
|
RENOVATION OF EXISTING STEPS @ CONSOLATION
|
JNC Contractor
|
86400
|
10/10/2017
|
05/11/2017
|
|
Grand Anse Mahe
|
GAM-05-18
|
LEVELLING AND RESURFACING OF ROAD AT PETIT BARBARONS
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Mahe
|
GAM-04-18
|
ROCK BREAKING AND ROAD ENLARGEMENT FOR TURNING POINT AT DAUBAN ESTATE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Mahe
|
GAM-03-18
|
CROSS DRAIN AT MRS FLORENTINE ROAD - CENTRAL
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Mahe
|
GAM-02-18
|
CROSS DRAIN, RESURFACING OF ROAD AND WATER BARRIER WALL AT SOUVENIR - LA MISERE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Grand Anse Mahe
|
GAM-01-18
|
UPGRADING OF RAMP & WATER BARRIER WAAL & RETAINING WALL - CENTRAL
|
Waste Tech Pty Ltd
|
21600
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-08-18
|
CONSTRUCTION AND REPAIRS OF PATHWAYS AND STEPS - GREENWICH
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-07-18
|
CONSTRUCTION OF FOOTPATH - UNION VALE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-06-18
|
CONSTRUCTION OF FOOTPATH/ STEPS - MA JOIE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-05-18
|
CONSTRUCTION OF TURNING AREA- UNION VALE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-04-18
|
CONSTRUCTION OF BIN SITE UNION VALE AND REPAIRS AT QUINCY VILLAGE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-03-18
|
CONSTRUCTION OF FOOTPATH, STEPS, RAILING, DRIVEWAY AND PLUM WALL - MA JOIE -PHASE 2
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-02-18
|
FENCING AT HOME FOR THE ELDERLY -UNION VALE - Additional Work
|
DIRECT BID
|
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-01-18
|
CONSTRUCTION OF FOOTPATH AND RE-INFORCEMENT OF EXISTING BRIDGE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-01-17
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD & DRAINAGE PHASE 2 @ MA JOIE
|
Sicobo Construction
|
9187.50
|
07/06/2018
|
07/06/2018
|
|
English River
|
EGR-01-17
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD & DRAINAGE PHASE 2 @ MA JOIE
|
Sicobo Construction
|
151645
|
15/01/2018
|
26/03/2018
|
|
Cascade
|
CAS-05-18
|
ROCK BREAKING
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Cascade
|
CAS-04-18
|
CONSTRUCTION OF FOOTPATH @ WATERFALL
|
Waste Tech Pty Ltd
|
334270
|
07/06/2018
|
07/06/2018
|
|
Cascade
|
CAS-03-18
|
CONSTRUCTION OF FOOTPATH / STEPS & INSTALLATION OF RAILING
|
Ezy Cleaning and Maintenance
|
66615
|
07/06/2018
|
07/06/2018
|
|
Cascade
|
CAS-01-18
|
UPGRADING OF FOOTPATH ACCESS @ PETIT PARIS
|
Exodus
|
40390
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-TR -17
|
TREE FELLING
|
PEC CLEARING & MAINTENANCE
|
35000
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-05-18
|
CONSTRUCTION OF FOOTPATH AND STEPS - LE NIOLE / CANADA
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-04-18
|
CONSTRUCTION OF RETAINING WALL, FOOTPATH, DRAINAGE AND RAMP - BEAU VALLON UPPER -SALOMON AREA
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-03-18
|
INSTALATION OF RAILING @ ROCHE BOIS
|
Waste Tech Pty Ltd
|
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-02-18
|
CONSTRUCTION / REHABILITATION OF DRAINAGE @ PASCAL VILAGE
|
Retender - all contractors disqualified
|
|
07/06/2018
|
07/06/2018
|
|
Beau Vallon
|
BVN-01-18
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD - DAN BERLIN
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA-06-18
|
CONSRUCTION OF ACCESS ROAD - VILLAGE JOSEPH - ANOLIA CEDRAS/FLAVIENNE/ JEANNE AND OTHERS
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA-05-18
|
CONSTRUCTION OF FEEDER ROAD - MAX/ BONTE/ STRAVENS - PHASE 01 - SITE PREPARATION
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA-03-18
|
SURFACING OF ROAD @ CAP SAMY
|
JNC Contractor
|
150500
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA -04-18
|
SURFACING OF ROAD @ EX- MOULINIE
|
JNC Contractor
|
130725.00
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA- 02-18
|
CONSTRUCTION OF ROAD @ ANSE LA BLAGUE
|
JNJ Contractor
|
131095.00
|
07/06/2018
|
07/06/2018
|
|
Baie St Anne
|
BSA- 01-18
|
CONSTRUCTION OF ROAD LANMISYON - DIVERSION
|
DIVY Construction
|
435647.00
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-TR-01-17
|
TREE FELLING - LOT 1
|
I.C.B Clean Plus
|
27200.00
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-05-18
|
CONSTRUCTION OF RETAINING & ACCESS ROAD - PHASE 2
|
RJH Plant Hire
|
269114.38
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-04-18
|
UPGRADING & CONSTRUCTION OF NEW DRAINAGE @ VAL MER
|
RJH Plant Hire
|
137971.00
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-03-18
|
ROCK BLASTING & CONSTRUCTION OF RETAINING WALL
|
ARB Contractor
|
75782.7
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-03-16
|
CONSTRUCTION OF FEEDER ROAD ANSE POUL BLEAU - (DUVAL)
|
Palm Construction
|
507366.32
|
30/10/2017
|
08/01/2018
|
|
Baie Lazare
|
BLZ-02-18
|
CONSTRUCTION OF STEPS & FOOTPATH - CEMETERY
|
Bonnelame Construction
|
9324
|
07/06/2018
|
07/06/2018
|
|
Baie Lazare
|
BLZ-01-18
|
IMPROVEMENT OF ACCES ROAD - ANSE GAULETTE - (PAYET/ CONFIANCE / MOREL)
|
ARB Contractor
|
190808
|
07/06/2018
|
07/06/2018
|
|
Belombre
|
BLM-05-18
|
SURVEY WORKS - MOTORABLE ACCESS - LE NIOLE GRAND TERRE
|
SELECTIVE
|
SELECTIVE
|
07/06/2018
|
07/06/2018
|
|
Belombre
|
BLM-04-18
|
SURVEY WORKS - MOTORABLE ROAD AND BRIDGE - BEAU BEL TO LE NIOLE
|
SELECTIVE
|
SELECTIVE
|
07/06/2018
|
07/06/2018
|
|
Belombre
|
BLM-04-17
|
CONSTRUCTION OF RETAINING WALL IN RIVER EMBANKMENT - ADDITIONAL WORK
|
A.M.B BUILDING CONTRACTOR
|
4000
|
07/06/2018
|
07/06/2018
|
|
Belombre
|
BLM-03-18
|
MOTORABLE ACCESS ROAD - CHANG-HIM TO HOAREAU PHASE 01
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Belombre
|
BLM-01-18
|
CONSTRUCTION OF DRAINAGE - NOE ROAD - JENNY JULIE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Bel Air
|
BEL-06-17
|
RETAINING WALL AND FOOTPATH - DAN ZANBLON
|
R & E Contractor
|
406550
|
05/01/2018
|
16/03/2018
|
|
Bel Air
|
BEL-03-18
|
COMPLETIONJ OF RETAINING WALL - PHASE 2 @ LA POUDRIERE
|
Henz Maintenance
|
40800
|
07/06/2018
|
07/06/2018
|
|
Bel Air
|
BEL-02-18
|
CONSTRUCTION PF PLUM/ STONE RETAINING WALL
|
Retender - bids too high
|
Retender - bids too high
|
07/06/2018
|
07/06/2018
|
|
Bel Air
|
BEL-01-18
|
CONSTRUCTION OF DRAINAGE & INSTALLATION OF STEEL GRILL - SANS SOUCIS DAY CARE
|
Retender with the same group of contractor - to corret the scope
|
Retender with the same group of contractor - to corret the scope
|
07/06/2018
|
07/06/2018
|
|
Bel Air
|
BEL-01-17
|
CONSTRUCTION OF RETAINING WALL @ DAN KOKO
|
Waste Tech Pty Ltd
|
150040
|
10/01/2018
|
26/03/2018
|
|
Anse Royale
|
ARO-03-18
|
CONSTRUCTION OF TWO(2) BIN SITES
|
Retender due to high cost of contractor
|
Retender due to high cost of contractor
|
07/06/2018
|
07/06/2018
|
|
Anse Royale
|
ARO-02-18
|
UPGRADING OF FEDER ROAD @ CAP BONM ZAN
|
Waste Tech Pty Ltd
|
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-TR-03-17
|
TREE FELLING - LOT 3
|
L & E CLEARING & MAINTENANCE
|
33600
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-TR-02-17
|
TREE FELLING - LOT 2
|
CLIFF ESTRALE
|
32800
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-TR-01-17
|
TREE FELLING - LOT 1
|
SNJ CLEANING AGENCY
|
37500
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-05-18
|
CONSTRUCTION OF MOTORABLE ACCESS AND DRAINAGE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-04-18
|
UPGRADING OF EXISTING DRAINAGE - ANSE ETOILE MARKET
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-03-18
|
ROAD IMPROVEMENT / RESURFACING OF EXISTING ROAD (QUINCY VILLAGE)
|
ANB Builders
|
188845
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-02-18
|
CONSTRUCTION OF MOTORABLE ACCESS @ HANGARD
|
RJH Plant Hirer
|
163200
|
07/06/2018
|
07/06/2018
|
|
Anse Etoile
|
AET-01-18
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD & STONE RETAINING WALL @ LA RETRAITE
|
Waste Tech
|
231758.75
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-08-18
|
CONSTRUCTION OF DRAINAGE PHASE 2 JERUSALEM
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-07-18
|
COMPLETION OF DRAINAGE - REEF ESTATE - CACAO
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-06-18
|
RESURFACING OF ROAD AND RETAINING WALL - GREEN ESTATE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-05-18
|
CONSTRUCTION OF PLUM WALL / UPGRADING OF DRAINAGE - VAL DE PRES
|
ACP
|
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-04-18
|
CONSTRUCTION OF BIN SITE - CAPUCIN
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-03-18
|
UPGRADING OF MOTORABLE ACCESS AND TURNING AREA - POINTE AU SEL UPPER
|
OPEN TENDER
|
Open Tender
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-02-18
|
INSTALLATION OF RAILINGS AND CONSTRUCTION OF WATER BARRIER WALL PHASE 2 - CAPUCIN
|
BMC Builders
|
173650
|
07/06/2018
|
07/06/2018
|
|
Au Cap
|
ACP-01-18
|
CONSTRUCTION OF BIN SITE - LA PLIENE STE ANDRE
|
OPEN TENDER
|
OPEN TENDER
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-11-17
|
CONSTRUCTION OF DRAINAGE
|
DIRECT BID - ADDITIONAL WORK
|
DIRECT BID - ADDITIONAL WORK
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-08-17
|
RELOCATION OF BOUNDARY BEACONS
|
Ah Kong Survey
|
700000
|
06/11/2017
|
30/11/2017
|
|
Anse Boileau
|
ABO-06-17
|
SURFACING OF ACCESS ROAD, CONSTTRUCTION OF BOUNDARY WALL AND BARRIER WALL - CAP ST MARIE - SERVINA , POOL AND OTHERS
|
Open Tender
|
Open Tender
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-04-18
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD - PHASE 3 - ANSE LOUIS UPPER
|
Open Tender
|
Open Tender
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-03-18
|
ENLARGEMNET OF EXISTING ACCESS ROAD @ CAP STE MARIE
|
to retender the project - quotes too high
|
to retender the project - quotes too high
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-03-18
|
ENLARGEMNET OF EXISTING ACCESS ROAD @ CAP STE MARIE
|
Tender
|
Tender
|
07/06/2018
|
07/06/2018
|
|
Anse Boileau
|
ABO-02-18
|
CONSTRUCTION OF ACCESS ROAD & DRAINAGE
|
Waste Tech Pty Ltd
|
522,818.75
|
07/06/2018
|
07/06/2018
|
|
Anse Aux Pins
|
AAP-11-17
|
Relocation of Beacons - Caryole - Michel Family (Survey Work)
|
Ah-Kong Land Survey
|
11000
|
20/02/2018
|
03/03/2018
|
|
Anse Aux Pins
|
AAP-07-18
|
CONSTRUCTION OF DRAINAGE - ONEZIME ESTATE - SOUNADIN
|
Evaluation
|
Evaluation
|
07/06/2018
|
07/06/2018
|
|
Anse Aux Pins
|
AAP-06-18 Anse Aux Pins CONSTRUCTION OF RETAINING WALL, BOUNDARY WALL, STEPS AND RAILING - BODAMIER
|
CONSTRUCTION OF RETAINING WALL, BOUNDARY WALL, STEPS AND RAILING - BODAMIER UPPER (GILBERT / CLIFF)
|
tendering
|
tendering
|
07/06/2018
|
07/06/2018
|
|
Anse Aux Pins
|
AAP-05-18
|
CONSTRUCTION OF NEW DRAINAGE, PLUM WALL AND ROAD - CAYOLE ESTATE (HOAREAU)
|
|
|
07/06/2018
|
07/06/2018
|
|
Anse Aux Pins
|
AAP-04-18
|
RELOCATION OF BIN SITE - RAMEAU LOWER
|
|
|
07/06/2018
|
07/06/2018
|
|
ANSE AUX PINS
|
AAP-04-18
|
RELOCATION OF BIN SITE - RAMEAU LOWER
|
OPEN TENDER
|
OPEN TENDER
|
04/05/2018
|
23/05/2018
|
|
ANSE AUX PINS
|
AAP-03-18
|
RELOCATION OF BIN SITE - RAMEAU UPPER
|
OPEN TENDER
|
OPEN TENDER
|
05/04/2018
|
23/04/2018
|
|
ANSE AUX PINS
|
AAP-02-18
|
FOOTPATH ACCESS AND DRAINAGE - CAPUCIN
|
OPEN TENDER
|
OPEN TENDER
|
23/04/2018
|
14/05/2018
|
|
ANSE AUX PINS
|
AAP-01-18
|
CONSTRUCTION OF MOTORABLE ACCESS ROAD, RAMP AND RAILING - BODAMIER
|
OPEN TENDER
|
OPEN TENDER
|
21/05/2018
|
21/05/2018
|
|